| Project |
| | Dredge & Landfill, Berths 55 and 56, Port of Oakland |
|
| Client |
|
| Role |
| | Subcontractor to General Construction Co.;
GLDD performed all cutterhead dredging and reclamation |
|
| Contract |
| | Dredge Type: Cutter Suction Dredge
Dredge: Florida
|
|
| Description |
| | This project was for the renovation of Berths 55 and 56 in the Oakland Inner Harbor Channel. The project entailed:
-
Cutter suction dredging 1,100,000 cubic yards of stiff material
-
Mechanical dredging 81,000 cubic yards of shoaled material and bay mud
-
Stripping 540,000 cubic yards from surface areas with land equipment
-
Hydraulic fill: In two lifts, first to 10 feet, then to 30 feet
|
|
| |