| Location |
|
| Client |
| | Durrat Khaleej al Bahrain |
|
| Contract |
| | Type: Cutter Suction Dredge
Dredge: Texas, California, Utah and Alabama
Quantity: 6,900,000 cubic meters |
|
| Description |
| | This project entailed dredging, reclamation and construction for a multi-use land development program. The large cutter suction dredges Texas, California performed the basic excavation and fill tasks for this project, with the smaller CSDs Alabama and Utah responsible for the detailed work and some of the canal excavation. The circular canal was excavated in the dry with land equipment. This work, and the rock-lined shore work by our joint venture partner, required close coordination including several other types of floating and shore equipment. The project was complicated by the poor existing ground conditions at the start of the project, which entailed special measures and fill placement. All told, 6,900,000 cubic meters were excavated and placed. |
|
| |