| Client |
| | The Ministry of Municipal Affairs & Agriculture |
|
| Contract |
|
| Description |
| | This project involved the deepening and widening of the entrance channel to the Port of Doha, the construction of a container terminal site, and bund construction for the future development of a new international airport.
- Channel Excavation: 16 km in length, 165 m wide, 11 m deep
- Material placement: Caprock, bedrock limestone, gravel, sand and silt material 10,000,000 cubic meters; 4,000,000 cubic meters of reclamation material
- Rock Armor Placement: 1,000,000 tons
|
|
| |